H&WB will develop a 75 MWac solar photovoltaic power plant in an 80-hectare land situated in Sitio San Miguel, Barangay Pinugay, Baras, Rizal. The site is approximately 39 kilometers southeast from Manila and can be reached by land transportation via Marikina-Infanta Road (Marcos Highway) from Cogeo.

Energy generated from the project will supply demand from Metro Manila, and is seen to fulfill the future Renewable Portfolio Standard (RPS) requirements of the distribution network.

The plant will be embedded to the MERALCO’s distribution network under a Power Supply Agreement.